TelanganaRERA Application

General Information

Other Than Individual

Organization

Edifice Projects Private Limited
Company
Yes
No
No

Address Details

Plot No 519H/1
EN's
Road No 28
Jubilee Hills
Near MCR HRD
Telangana
Hyderabad
500033

Organization Contact Details

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1Fort View EdificeMixed Development (Residential & Commercial)NA1848.68-1 3 Near Sai Ram Enclave Hydershahkote Hyderabad313731/08/201431/08/2015
2Tulip EdificeResidentialNA782Plot No 137 Near APSWRC Near Alkapur Township Neknampur Village Hyderabad Plot 13711531/01/201731/01/2017

Member Information

Member Name Designation Photo
E N Prasad Reddy Managing Director View Photo
E N Prasad Reddy Authorized Signatory View Photo
Geetha Prasad Erusu Director View Photo
Praneet Reddy Erusu Director View Photo

Project Information

HMDA
Orchid Edifice
New Project
30/01/2019
31/03/2022
No
Residential
Yes

Land Details

250
35,36,37,38
747.60
0
747.60
1
1
30 ft Wide Road
Plot No 39
35 ft Wide Road
Neighbors

Built-Up Area Details

1859.05
198.30

Address Details

Telangana
Hyderabad
Quli Qutub Shah Layout
Quli Qutub Shah Layout
500089

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement Office Number Other Details
Orchid Edifice Salam Bin Abdul Rahim Baneem Individual AreaShare NA House

Project Details

Name Proposed Booked WorkDone(In %)
Open Parking (In sqmts) 0 0 0
Covered Parking ( In Numbers) 18 0 0

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Supply : YES 100 Bore Water
Sewerage (Chamber, Lines, Septic Tank , STP) : YES 0 Lines
Storm Water Drains : NO 0 NA
Green Strip/TOT LOT/Park : NO 0 NA
Street Lighting : YES
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : YES 0 Trash Disposal
Water Conservation, Rain water Harvesting : YES 0 Rain Water Harvesting
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : YES 0 Electrical Panel Board
Aggregate area of recreational Open Space : NO 0 NA
Generator : YES 0 Generator
Lift : YES 0 Lift
Transformer : YES 0 Transformer

Building Details

Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
1 Orchid Edifice Orchid Edifice 31/03/2022 00:00:00 5 401
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 False Three Bedroom 162.81 1 0
2 1 False Two Bedroom 127.70 1 0
3 1 False Two Bedroom 125.23 1 0
4 2 False Three Bedroom 162.81 1 0
5 2 True Two Bedroom 124.70 1 0
6 2 True Two Bedroom 125.23 1 0
7 3 False Three Bedroom 162.81 1 0
8 3 False Two Bedroom 124.70 1 0
9 3 False Two Bedroom 125.23 1 0
10 4 False Three Bedroom 162.81 1 0
11 4 False Two Bedroom 124.70 1 0
12 4 False Two Bedroom 125.23 1 0
13 5 False Three Bedroom 162.81 1 0
14 5 False Two Bedroom 124.70 1 0
15 5 False Two Bedroom 125.23 1 0
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 0
2 X number of Basement(s) and Plinth 0
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 0
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 0
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 0
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 0
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

0
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 0
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name TelanganaRERA Certificate No. Professional Type
Erusu Praneet Reddy NA Structural Engineer
T RAGHAVENDRA RAO NA Architect

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Approval Layout Plan
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Declaration in FORM B
Certificates of Architect (Form 4)
Certificates of CA (Form 5)
Commencement Certificate/Copy of Building Permit/Proceedings
Copy of Sanctioned Building Plan
GST Certificate / Details
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Copy of Proceeding Building Permission