TelanganaRERA Application

General Information

Other Than Individual

Organization

ARB INFRA PROJECTS
Partnership
Yes
No
No

Address Details

H.NO.2-44/1,
FLAT NO-103
SAINAGAR
CHAITANYAPURI
NEAR GANGA HOSPITAL
Telangana
Ranga Reddy
Saroornagar
Sainagar
500060

Organization Contact Details

Past Experience Details

Sr.No.
Project Name
Type of Project
Others
Land Area(In Sq mtrs)
Address
CTS Number
Number of Buildings/Plot
Number of Apartments
Original Proposed Date of Completion
Actual Date of Completion
1SHREEMUKH KONTHAMS TOWERSResidentialNA5494.45H.No.1-10-373 to 388 BRAHMANWADI BEGUMPET HYDERABAD-5000161-10-373 TO38819809/06/201413/10/2014
2URBON COUNTYResidentialNA3035.14SY.NO.118 & 119P GACHIBOWLI HYDERABAD SYNO118,119P15512/08/201610/10/2016

Member Information

Member Name Designation Photo
ANJAN REDDY SINGIREDDY Authorized Signatory View Photo
BHASKAR KARNATI Partner View Photo
SRIDHAR ADDAGATLA Partner View Photo
NAVEEN KARNATI Partner View Photo

Project Information

HMDA
SVS RESIDENCY
New Project
01/11/2018
31/10/2024
No
Residential
Yes

Land Details

102 PART
10-132
2077.61
00
2077.61
40
40
SY NO 102 PART
SY NO 102 PART
30 FEET ROAD
SY NO 101 PART

Built-Up Area Details

5156.1
577.16

Address Details

Telangana
Medchal-Malkajgiri
Medipally
Sy.No.102 Om Vihar Colony, Medipally, Hyderabad-500039
NEAR N.H-163 HYDERABAD TO WARANGAL
500039

Promoter(Land Owner/ Investor) Details

Project Name Promoter Name Promoter(Land Owner/ Investor) Type Type of Agreement/ Arrangement Office Number Other Details
SVS RESIDENCY ARB INFRA PROJECTS Partnership AreaShare 04027116977 FLAT NO-103, SAINAGAR

Project Details

Name Proposed Booked WorkDone(In %)
Open Parking (In sqmts) 00 00 00
Covered Parking ( In Numbers) 40 00 00

Development Work

Common areas And Facilities, Amenities Available Percent Details
Internal Roads & Footpaths : NO 0 NA
Water Supply : YES 0 0
Sewerage (Chamber, Lines, Septic Tank , STP) : NO 0 NA
Storm Water Drains : NO 0 NA
Green Strip/TOT LOT/Park : YES 0 0
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Water Conservation, Rain water Harvesting : YES 0 0
Energy management : NO 0 NA
Fire Protection And Fire Safety Requirements : NO 0 NA
Electrical Meter Room, Sub-Station, Receiving Station : NO 0 NA
Aggregate area of recreational Open Space : YES 0 0
Entrance Gate with Security room and CC cameras : YES 0 0
24 Hrs power supply for common areas and 8 power points per each flat : YES 0 0
Land scaped children play area : YES 0 0

Building Details

Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
1 SVS RESIDENCY FLAT NO-101 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 False 3BHK 143 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
2 SVS RESIDENCY FLAT NO - 102 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 False 3BHK 145 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
3 SVS RESIDENCY FLAT NO - 103 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 True 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
4 SVS RESIDENCY FLAT NO - 104 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
5 SVS RESIDENCY FLAT NO - 105 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 True 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
6 SVS RESIDENCY FLAT NO - 106 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 True 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
7 SVS RESIDENCY FLAT NO - 107 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 True 3BHK 149 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
8 SVS RESIDENCY FLAT NO - 108 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 1 True 3BHK 150 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
9 SVS RESIDENCY FLAT NO - 201 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 143 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
10 SVS RESIDENCY FLAT NO - 202 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 145 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
11 SVS RESIDENCY FLAT NO - 203 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
12 SVS RESIDENCY FLAT NO - 204 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
13 SVS RESIDENCY FLAT NO - 205 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BKH 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
14 SVS RESIDENCY FLAT NO - 206 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
15 SVS RESIDENCY FLAT NO - 207 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 149 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
16 SVS RESIDENCY FLAT NO - 208 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 2 False 3BHK 150 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
17 SVS RESIDENCY FLAT NO - 301 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 143 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
18 SVS RESIDENCY FLAT NO - 302 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 145 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
19 SVS RESIDENCY FLAT NO - 303 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
20 SVS RESIDENCY FLAT NO - 304 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
21 SVS RESIDENCY FLAT NO - 305 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
22 SVS RESIDENCY FLAT NO -306 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
23 SVS RESIDENCY FLAT NO - 307 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 149 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
24 SVS RESIDENCY FLAT NO - 308 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 3 False 3BHK 150 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
25 SVS RESIDENCY FLAT NO - 401 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 143 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
26 SVS RESIDENCY FLAT NO - 402 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 145 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
27 SVS RESIDENCY FLAT NO - 403 31/10/2024 00:00:00 1 6 4 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
28 SVS RESIDENCY FLAT NO - 404 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
29 SVS RESIDENCY FLAT NO - 405 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
30 SVS RESIDENCY FLAT NO - 406 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
31 SVS RESIDENCY FLAT NO - 407 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 149 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
32 SVS RESIDENCY FLAT NO - 408 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 4 False 3BHK 150 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
33 SVS RESIDENCY FLAT NO - 501 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 143 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
34 SVS RESIDENCY FLAT NO - 502 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 145 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
35 SVS RESIDENCY FLAT NO - 503 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
36 SVS RESIDENCY FLAT NO - 504 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
37 SVS RESIDENCY FLAT NO - 505 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 136 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
38 SVS RESIDENCY FLAT NO - 506 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 153 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
39 SVS RESIDENCY FLAT NO - 507 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 149 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0
Sr.No. Project Name Name Proposed Date of Completion (As approved by Competent Authority) Number of Basement's Number of Plinth Number of Podium's Number of Slab of Super Structure Number of Stilts Number of Open Parking Total Parking Area (In sqmts)
40 SVS RESIDENCY FLAT NO - 508 31/10/2024 00:00:00 1 6 1 12
Sr.No. Floor ID Mortgage Area Apartment Type Saleable Area (in Sqmts) Number of Apartment Number of Booked Apartment
1 5 False 3BHK 150 1 00
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 00
2 X number of Basement(s) and Plinth 00
3 X number of Podiums 00
4 Stilt Floor 00
5 X number of Slabs of Super Structure 00
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 00
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the Flat/Premises 00
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks. 00
9

The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building/Wing

00
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate 00
11 Overall Percentage of Completion of the work done For the entire Building /Wing 0

Project Professional Information

Professional Name TelanganaRERA Certificate No. Professional Type
P.KRIPANAND NA Architect
M. VIJAYA KUMAR NA Structural Engineer

Uploaded Documents

Document Name Uploaded Document
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Copy of the legal title report
Details of encumbrances
Copy of Approval Layout Plan
Copy of Approval Layout Plan
Copy of Approval Layout Plan
Proforma of the allotment letter and agreement for sale
Proforma of the allotment letter and agreement for sale
Declaration in FORM B
Certificates of Architect (Form 4)
Certificates of CA (Form 5)
Commencement Certificate/Copy of Building Permit/Proceedings
Copy of Sanctioned Building Plan
Copy of Sanctioned Building Plan
Copy of Sanctioned Building Plan
GST Certificate / Details
Status of Formation of Legal Entity (Society/Co Op etc.)
Status of Conveyance
Copy of Proceeding Building Permission