Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
1 |
R.V.SOMWRITA
|
VILLA 1
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
12 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
179 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
2 |
R.V.SOMWRITA
|
VILLA 2
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
3 |
R.V.SOMWRITA
|
VILLA 3
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex VIlla |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
4 |
R.V.SOMWRITA
|
Villa 4
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex villa |
215 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
5 |
R.V.SOMWRITA
|
VILLA 5
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
6 |
R.V.SOMWRITA
|
VILLA 6
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
7 |
R.V.SOMWRITA
|
VILLA 7
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
17 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
222 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
8 |
R.V.SOMWRITA
|
VILLA 8
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
17 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
222 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
9 |
R.V.SOMWRITA
|
VILLA 9
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
10 |
R.V.SOMWRITA
|
VILLA 10
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
11 |
R.V.SOMWRITA
|
VILLA 11
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
12 |
R.V.SOMWRITA
|
VILLA 12
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
13 |
R.V.SOMWRITA
|
VILLA 13
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
14 |
R.V.SOMWRITA
|
VILLA 14
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
12 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex VIlla |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
15 |
R.V.SOMWRITA
|
VILLA 15
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
18 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
199 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
16 |
R.V.SOMWRITA
|
VILLA 16
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
19 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
207 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
17 |
R.V.SOMWRITA
|
VILLA 17
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
20 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
218 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
18 |
R.V.SOMWRITA
|
VILLA 18
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
20 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
218 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
19 |
R.V.SOMWRITA
|
VILLA 19
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
20 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
218 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
20 |
R.V.SOMWRITA
|
VILLA 20
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
21 |
R.V.SOMWRITA
|
VILLA 21
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
22 |
R.V.SOMWRITA
|
VILLA 22
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
20 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
218 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
23 |
R.V.SOMWRITA
|
VILLA 23
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
12 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
179 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
24 |
R.V.SOMWRITA
|
VILLA 24
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
13 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
180 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
25 |
R.V.SOMWRITA
|
VILLA 25
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
26 |
R.V.SOMWRITA
|
VILLA 26
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
27 |
R.V.SOMWRITA
|
VILLA 27
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
28 |
R.V.SOMWRITA
|
VILLA 28
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
10
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
71
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
29 |
R.V.SOMWRITA
|
VILLA 29
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
30 |
R.V.SOMWRITA
|
VILLA 30
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
15 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
193 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
31 |
R.V.SOMWRITA
|
VILLA 31
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
27 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
244 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
32 |
R.V.SOMWRITA
|
VILLA 32
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
33 |
R.V.SOMWRITA
|
VILLA 33
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
34 |
R.V.SOMWRITA
|
VILLA 34
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
35 |
R.V.SOMWRITA
|
VILLA 35
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
36 |
R.V.SOMWRITA
|
VILLA 36
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
37 |
R.V.SOMWRITA
|
VILLA 37
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
38 |
R.V.SOMWRITA
|
VILLA 38
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
19 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
240 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
39 |
R.V.SOMWRITA
|
VILLA 39
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
23 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
252 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
40 |
R.V.SOMWRITA
|
VILLA 40
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
41 |
R.V.SOMWRITA
|
VILLA 41
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
42 |
R.V.SOMWRITA
|
VILLA 42
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
43 |
R.V.SOMWRITA
|
VILLA 43
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
44 |
R.V.SOMWRITA
|
VILLA 44
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
45 |
R.V.SOMWRITA
|
VILLA 45
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
46 |
R.V.SOMWRITA
|
VILLA 46
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
18 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
199 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
47 |
R.V.SOMWRITA
|
VILLA 47
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
48 |
R.V.SOMWRITA
|
VILLA 48
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
True |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
49 |
R.V.SOMWRITA
|
VILLA 49
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
True |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
50 |
R.V.SOMWRITA
|
VILLA 50
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
True |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
51 |
R.V.SOMWRITA
|
VILLA 51
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
52 |
R.V.SOMWRITA
|
VILLA 52
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
53 |
R.V.SOMWRITA
|
VILLA 53
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
20 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
218 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
54 |
R.V.SOMWRITA
|
VILLA 54
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
216 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
55 |
R.V.SOMWRITA
|
VILLA 55
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
56 |
R.V.SOMWRITA
|
VILLA 56
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
True |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
57 |
R.V.SOMWRITA
|
VILLA 57
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
True |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
58 |
R.V.SOMWRITA
|
VILLA 58
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
True |
Duplex Villa |
215 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
59 |
R.V.SOMWRITA
|
VILLA 59
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
220 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
60 |
R.V.SOMWRITA
|
VILLA 60
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
16 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
220 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
61 |
R.V.SOMWRITA
|
VILLA 61
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
17 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
205 |
1 |
1 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
62 |
R.V.SOMWRITA
|
VILLA 62
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
27 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
244 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
63 |
R.V.SOMWRITA
|
VILLA 63
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
64 |
R.V.SOMWRITA
|
VILLA 64
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
65 |
R.V.SOMWRITA
|
VILLA 65
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
66 |
R.V.SOMWRITA
|
VILLA 66
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
67 |
R.V.SOMWRITA
|
VILLA 67
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
68 |
R.V.SOMWRITA
|
VILLA 68
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
21 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
231 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
69 |
R.V.SOMWRITA
|
VILLA 69
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
19 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
240 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
1
|
Excavation
|
100
|
2
|
X number of Basement(s) and Plinth
|
100
|
3
|
X number of Podiums
|
0
|
4
|
Stilt Floor
|
0
|
5
|
X number of Slabs of Super
Structure
|
100
|
6
|
Internal walls, Internal Plaster,
Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises
|
100
|
7
|
Sanitary Fittings within the
Flat/Premises,Electrical Fittings within the Flat/Premises
|
100
|
8
|
Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and Underground Water Tanks.
|
100
|
9
|
The external plumbing and external plaster,
elevation, completion of terraces with waterproofing of the Building/Wing
|
100
|
10
|
Installation of lifts, water pumps, Fire
Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common
Areas, electro, mechanical equipment, Compliance to conditions of environment
/CRZ NOC,
Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be required to
Obtain Occupation /Completion Certificate
|
100
|
11 |
Overall Percentage of Completion of the
work done For the entire Building /Wing
|
80
|
|
Sr.No. |
Project Name
|
Name
|
Proposed Date of Completion (As approved by Competent Authority)
|
Number of Basement's
|
Number of Plinth
|
Number of Podium's
|
Number of Slab of Super Structure
|
Number of Stilts
|
Number of Open Parking
|
Total Parking Area (In sqmts)
|
70 |
R.V.SOMWRITA
|
VILLA 70
|
31/03/2022 00:00:00
|
1
|
1
|
0
|
2
|
0 |
|
23 |
|
|
Sr.No.
|
Floor ID
|
Mortgage Area
|
Apartment Type
|
Saleable Area (in Sqmts)
|
Number of Apartment
|
Number of Booked Apartment
|
1 |
1 |
False |
Duplex Villa |
252 |
1 |
0 |
|
|
|
Sr.No.
|
Tasks / Activity
|
Percentage of Work
|
| |